Basalt Stone Production Line Broken Program

Posted by kuangshanposui on September 19th, 2018

In the production plant for chrome mining process of basalt crusher plant, first of all, stone from coarse crushing machine for preliminary broken, and then to the coarse material by belt conveyor to finely machine for further broken, finely after the stone into the vibrating sieve sieve to separate the two stones, satisfy the system sand machine feed particle size of gravel into the mechanism of sand sand, another part of the return of material into fine broken. Into the sand making machine made sand, stones of the sand washing machine (optional) made into finished products after cleaning sand, the other part into the sand making machine is broken again.

About basalt, salt grinding plant for sale crushing processing, general selection of jaw crusher and impact crusher broken two pieces, but with the improvement of the country in recent years, the grain shape of stone, as far as possible the choice of three stage crushing, which is combined with a hydraulic cone crusher, reduce needle flake. Superficially add a device to improve the production cost, but for quarry long-term operation, through the three sections of the broken broken high hardness and high silicon content of stone to reduce the production cost is very considerable.

The Following Is A Typical Basalt Crushing Plant Programs

1. Vibrating feeder + jaw crusher + impact crusher + vibrating screen + belt conveyor 2. The vibrating feeder + jaw crusher + finely jaw crusher + vibrating screen + belt conveyor 3. The vibrating feeder + jaw crusher + finely jaw crusher + impact crusher + vibrating screen + belt conveyor 4. The vibrating feeder + jaw crusher + impact crusher + hydraulic cone crusher + vibrating screen + belt conveyor

Like it? Share it!


kuangshanposui

About the Author

kuangshanposui
Joined: May 16th, 2018
Articles Posted: 149

More by this author