Yihui Bolt Factory Is Your Solid Dependence

Posted by abyihui on August 27th, 2019

1. Time requirements are tight. When the marine oil pipe injection or the gas gas cabinet leaks during the voyage, it is necessary to take emergency measures under the load condition: firstly, the quick adhesive should be used to block the gap, and then the blocking device should be strengthened to make it no longer weak. Link. All of this requires completion in a relatively short period of time, and can maintain normal operation for a long period of time and even long-term operation.

2. High strength requirements. Except for special reasons, most of the damage to mechanical equipment occurs in weak links or where stress is concentrated. When using glue repair, high-strength structural adhesive must be used in combination with appropriate mechanical connection, and the whole process should be very careful to prevent mechanical stress and thermal stress.

3. The process is difficult. For the usual bonding process, the joint can be designed in advance. Even if the glue is used on the shaped product, the bonding method and the joint are generally regular. The cracks of the damaged equipment often appear in unpredictable positions, the joints are also strange, and some huge equipment can not be moved at all. This brings great difficulties to a series of processes such as pre-treatment, sizing, heating and curing.

Choosing a professional Bolt Factory, Haiyan Yihui Hardware Technology Co., Ltd. provides you with diversified support and help. We are your most solid support and support, so if you have any needs, please let us know.

Like it? Share it!


abyihui

About the Author

abyihui
Joined: June 11th, 2019
Articles Posted: 36

More by this author