Short-term overview for copper market 'unpredictable': Antofagasta

Posted by Hemmingsen Lockhart on January 22nd, 2021

The temporary outlook for the copper market "is anticipated to continue to be volatile as national stimulation programs, macro-economic occasions as well as motions in the buck continue to dominate the monetary markets as well as affect the rate of copper," UK-listed Chilean miner Antofagasta claimed Tuesday. The market is also affected by the weak scrap supply, where refining fees for smelters are less than concentrate TC/RCs with new supply originating from Peru and elsewhere, the business said in its half-year monetary statement. "There have actually been few cuts in mine production up until now this year showing the sector's ongoing success in reducing expenses and the conditioning of the copper cost," Antofagasta stated. "If rates damage in the direction of .00/ pound or below with conviction then provide cuts can be expected, but in the meanwhile supply surpluses are forecast till a minimum of 2018 as demand growth is anticipated to stay modest," the company included. The London Metal Exchange money negotiation rate for copper was ,746/ mt (.15/ pound) on Monday, and also has averaged ,729/ mt for 2016 to date. The overview beyond 2018 looks stronger when the marketplace is anticipated to go into deficiency, Antofagasta stated. biocides oil and gas took a similar view Tuesday, saying in its results declaration for 2015-16 fiscal year (July-June) that "copper costs remain to be affected by expanding supply on the back of enhancing levels of performance and somewhat weak rates of need growth." In the short to medium term, "brand-new and enhanced manufacturing must keep the market well supplied, notwithstanding revealed cuts to higher-cost production," BHP said. In the longer term, "the copper outlook remains favorable as need is supported by China's shift towards consumption in addition to the extent for significant growth in other emerging markets," it added. A shortage is expected to emerge "as grade decline and also restricted top notch development opportunities constrain the market's ability to cheaply fulfill growing need," BHP stated. Antofagasta's copper manufacturing for the complete year 2016 is anticipated to be at the reduced end of the 710,000-740,000 mt assistance provided in January, the firm stated Tuesday. BHP Billiton generated 1.58 million mt of copper in 2015-16, and also expects this to increase by 5% to 1.66 million mt in 2016-17.

Like it? Share it!


Hemmingsen Lockhart

About the Author

Hemmingsen Lockhart
Joined: January 22nd, 2021
Articles Posted: 4

More by this author