Data Structure management system DCIM is an integral and one of the most crucial parts of modern businesses. The global DCIM market is expected to reach USD 6.168 billion by 2025, which has been evaluated at USD 1.701 billion in 2019. The high-rank density and the need to manage limited space in the past years have been driving the market. DCIM is becoming complex to manage with dynamic landscapes. Everything must run efficiently to enable business continuity, including power, cooling, cable, and space.

Moreover, the rising demand of DCIM for being an energy-efficient data centre is a key component for driving growth. Improving IT equipment power usage in most cases can result in the greatest overall improvement in the efficiency of power usage, and for data centre managers optimizing data centre power has become a high priority. But as power becomes a large percentage of ongoing data centre cost, they continue to face challenges. Data Center managers should take the five key steps in sequence to maximize efficiency. They help monitor and measure power usage so that improvement can be monitored along the way.

The five tips for efficient data center infrastructure management include:

IT power Optimization

Data centre managers need to lower the amount of power to IT equipment as IT systems ultimately require power delivery. They should take crucial measures to reduce the power as 60% of the payload power is consumed by the user

  • One must eliminate everything that is not necessary and clean up the workloads.
  • Virtual machines should be consolidated. 
  • Workloads must be more virtualized.
  • One must eliminate those servers which are powerful but are not in use. 
  • One must replace all the old servers with new ones.
  • Data centre space must be optimized

Enabling the reduction of the necessary space for IT equipment and less IT power data centre built before the advent of service virtualization may be overweight for today's equipment needs. There must be a modular design when building a new data centre that breaks down the data centre into individual models. Thus, it can be refreshed as a part of a more organic and flexible data Center design.

Optimization of data centre cooling

A data centre manager should ensure that the operation of basic data centre cooling best practices to achieve a minimum efficiency level.

  • One must install an economizer. 
  • It should contain heat and equipment.
  • Must optimize the air conditioning system.

Eliminating of cooling inefficiencies and data centre power

Outdated power delivery systems, including power distribution units, an interrupt table, power supplies, and Transformers, can negatively impact PUE ratios. Future requirements, modern alternatives, and evaluating the current situation require time and investment. Typically, generating a good written in terms of PV ratio will help in savings and improvement.

DCIM tools should be utilized

Refinements to energy efficiency can be achieved by using DCIM software. Data centre infrastructure management software provides the necessary link between the physical facilities such as environment control and building and the IT equipment's operational needs.