Etelux Glove box regeneration steps

Posted by Hurst Richards on March 12th, 2021

1) Regeneration gas: a mixture of hydrogen and inert gas (hydrogen accounts for 5% -ten%) two) Amount: 40L gasoline cylinder 10Mpa 3) Regenerative gasoline pressure: .05Mpa (the gasoline consumption for each fifty percent hour in the point out of .05Mpa is that the cylinder strain drops by one.5Mpa. If it exceeds one.5Mpa, the pressure of the stress regulator’s routine will be diminished, if it is significantly less than 1.5Mpa Improve the force of the strain regulator routine) 4) Process: 3 hours heating-3 hrs heating and air flow-3 several hours vacuuming-1 hour pumping-10 hours cooling 5) Steps: ① Join the regeneration gasoline (check out the pipeline for leaks right after connection: right after connecting, open the principal valve of the pressure lowering valve to the highest, open up the auxiliary meter to .1Mpa, change off the major valve, hold out fifteen minutes, if the force of the auxiliary meter continues to be at .one Mpa stays unchanged, indicating no air leakage) ②Set the force of the auxiliary gauge of the pressure lowering valve to .1Mpa (the stress throughout air flow is about .06-.08MPa) ③ Shut the cycle and analyzer ④Turn on the vacuum pump ⑤ Commence regeneration ⑥ The new software ends at 20h (clean before cleansing, water and oxygen index <200ppm). 6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Inert Controlled 4 Glove Glovebox Atmospheres reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 hours! 7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.

Like it? Share it!


Hurst Richards

About the Author

Hurst Richards
Joined: March 12th, 2021
Articles Posted: 1