Safeguards when operating the etelux glove box

Posted by Bille Wilcox on March 14th, 2021

Vacuum glove box is broadly utilised in industries with substantial needs for gasoline purification. Despite the fact that the existing glove box layout is a lot more realistic and easy to run. Even so, Hundred Class Purification Glove Box, inside the glove box is difficult, there are numerous crucial components, and the procedure is slightly poor, which could result in decline to your experimental benefits. This article introduces you how to accurately use the vacuum glove box, and the safeguards when novices run the glove box. A single. Operate ahead of operation: 1. Check out if there is nitrogen in the nitrogen bottle. The nitrogen ought to be changed in time. The output force of nitrogen is established to .4mpa. two. Check regardless of whether the vacuum pump is turned on generally. three. Check out no matter whether the circulation in the glove box is open. (Purification column-I or purification column-II ought to open one of them) four. Check out the higher restrict pressure in the environment should be +one, the lower limit force is 5. Examine whether oxygen and dew level are typical (oxygen is under .1ppm, dew level is earlier mentioned -40) six. The vacuum pump of the more than-bin must be in the usually open up point out two. Operation notes: 1. The vacuum pump need to be kept on for the duration of system procedure. two. When the oxygen focus in the tank exceeds 200PPM, the products routine maintenance personnel need to be notified to operate the method, or else the water and oxygen purification system will be ruined. 3. Prior to beginning the cycle, examine regardless of whether the cupboard is in problem or regenerating. As the above pointed out operations are in progress, it is absolutely forbidden to cycle. 4 .Two purification columns are not able to be regenerated at the exact same time. A. Ahead of regeneration, make sure that the glove box has been cleaned with inert gasoline (H2O <200ppm) to ensure sufficient supply of regeneration gas. The regeneration gas pressure is 0.06-0.08mpa. B. Before starting regeneration, please make sure that the corresponding purification column circulation is closed. C. The regeneration process takes 24 hours. Once the execution cannot be disconnected, the regeneration gas should be passed 3-6 hours after the regeneration starts. Pay attention to the amount of regeneration gas, adjust the pressure of the regeneration gas appropriately, and ensure the sufficient supply of regeneration gas in these 3 hours. After 6 hours the regeneration origin can be turned off. D. The vacuum pump cannot be turned off during the regeneration process. Do not touch the top of the purification column to prevent burns. E. Once the regeneration is terminated unexpectedly, please ensure that the regeneration and circulation of the purification column cannot be restarted within 12 hours or the equipment will be damaged. 5. Care should be taken to protect the work gloves from being damaged during the operation.

Like it? Share it!


Bille Wilcox

About the Author

Bille Wilcox
Joined: March 13th, 2021
Articles Posted: 1