Hire a grab in Waterlooville, a feasible alternative to a skip

Posted by Brian Miller on March 27th, 2016

When working on a large construction project in Waterlooville, the best alternative to a skip would be to choose a grab hire Waterlooville company for a grab. If it’s a project in Portsmouth, grab hire Portsmouth services are also readily available to make the procedure of construction waste management much easier.

Even though quite a number of people can be heard raving about skip hire as one of the best construction waste management services, there comes a time when the regular container cannot perform much. Grabs have more beneficial features that make them better for waste management than a conventional skip. Therefore, project managers need not hesitate about considering to hire a grab in Portsmouth or Waterlooville.

Those people who have worked in construction sites understand how much waste is generated regularly. Usually, most projects use a skip to hold the waste as it awaits to be collected for disposal. However, plenty of unexpected occurrences that relate to the weight and size of skips make it difficult to remove once filled up. With a grab, issues of weight and size are not a concern as the track can easily move when there’s need to remove the waste. This sounds like a better reason to go for a grab hire Waterlooville company to run the project swiftly and smoothly.

The issue that containers cannot be placed by the road side without a permit from the council is usually overlooked by many project managers. As a result, it can create other miscellaneous expenses as well as waste of time, which were not in the project budget and plan. Of course, anyone can tell the importance of the two aspects to the success of a project. It is, therefore, recommendable to hire a grab to avoid creating budget and time extensions to the project.

When project managers, working in Portsmouth or Waterlooville, consider to choose a grab hire Portsmouth or in Waterlooville, the need to lift waste with a skip is eradicated. This way, the construction project will continue swiftly without worries of managing the waste. Additionally, the size of skip needed will not be a consideration once a grab is in place. A grab can collect as much construction waste as 18 tonnes in weight and move it for disposal with ease.

Management of construction waste is one of the most demanding parts of a project. With a grab, waste can be taken on and off the construction site without any hustles. When done effectively, the project site looks uncluttered and operations move swiftly. Thus, a project manager is left with more time to focus on the important issues of the project rather than managing waste. This can only be made possible by considering to hire a grab for the project.

A grab is perfect for smaller construction project sites. It can be manoeuvred easily to suit space requirements as it does not occupy much space. As for a skip, once filled with the construction waste, making a space adjustment will not only be difficult but will also be seemingly impossible to achieve. Use of a grab instead makes the entrances and exits free and easily accessible. When there is more free space within the construction site, chances of accident occurrences are also minimized.


Going for a grab hire Portsmouth company is the most effective way of managing site waste as compared to a skip. Grab hire Waterlooville services are also made accessible for easier management of construction projects.

Like it? Share it!


Brian Miller

About the Author

Brian Miller
Joined: January 21st, 2016
Articles Posted: 1,651

More by this author