Maintenance services of the UPS power system involve specific functions to ensure uninterrupted services. It includes over 30 to 40 maintenance checks along with load testing and determining the backup time available on your batteries, spare parts or time, and material services. These services is available to the customers who are new in this field by UPS AMC Contractors in UAE. Maintenance services will check the functions of the batteries and connections to ensure that they will continue for a longer period of time.

To ensure that your battery doesn’t run out at the very time you require it, make sure to schedule regular maintenance. This maintenance service will significantly depend on the wish and requirements of the customer. However, it will also depend on Battery Maintenance and Installation services in UAE. Here are some procedures that are included in maintenance services:

Quarterly

  • Visual inspection of equipment if there are any loose connections, burned insulation, or any other defect.
  • Functional checkouts and Battery Maintenance and Installation services in UAE for temperature, dust, moisture, room vents, etc.
  • Inspection of switchboards and wires if there is any sign of abrasions and burn spots, signs of overheating, swelling, leaking, etc. Examining the printed circuit board alignment.

Semi-annually

  • Replacing the air filters and checking out visually the liquid contamination from batteries and capacitors.
  • Vacuuming and cleaning of UPS equipment enclosures.
  • Checking out the equipment and performance for temperature and humidity-related issues. Here UPS AMC Contractors in UAE can help a lot.
  • Check out each system whether they are working properly or not. This includes switchgear and circuit breakers, meters, and alarm levels. What is the frequency, voltage, current, transfer, trip, alarm, etc?
  • Checking out the power connection and tightening them at the input and output terminals, circuit breakers, and at terminal posts.

Annually

  • At this stage of maintenance, thermal scans will be conducted on electrical connections to ensure that they are placed tightly and do not generate heat that is the indication of a major problem.
  • Hot spots will be detected with the help of non-invasive diagnostic tools that are not visible to a human eye.
  • A complete operational test of the system is carried out that will include a monitored battery rundown test that will help to determine if any battery is stringing or cells are at the end of their life span. You can then consider APC UPS Battery Replacement Services in UAE.
  • an off-line load test will be carried out to ensure that the UPS system is completely functional.

Biennially

  • Replacement of control batteries from APC UPS Battery Replacement Services in UAE if they have run out
  • Replacement of AC power
  • Testing the transfer switches, circuit brakes, and bypasses.