During installation, the bolts should be loosened, and the welding seam of the side plate and the bottom rib plate connecting the foundation and the flange should be cut open, and the pre-tightening bolts on the joint surface should be processed according to the above operation, and then welded.

If the location and cause of the leak cannot be determined, or if the operation effect is not good, you can try to fill the sealant around the kaolin milling equipment on-line surface flow plate, or solve the leakage problem by continuously welding the joint surface flow mouth circumference well.

The structure of the kaolin milling equipment gate failure gate is relatively simple, located at the tail of the kaolin milling equipment, and is used to adjust the liquid level in the tank. The installation, debugging and use frequency are high, and the handwheel is prone to be damaged, the improvement is blocked, and the water running failure occurs.

Like it? Share it!


birder2525

About the Author

birder2525
Joined: May 10th, 2018
Articles Posted: 204

More by this author