To Know More Different Size & Style of Tiles

Posted by Fliesentechnik Drescher on November 26th, 2018

When you are getting ready to install the tile floors you may need to get the ceramic or porcelain tiles, cement backer board, tile nippers, sponges, tape measure, knee pads, tile cutter or tile saw, grout, square, rubber flow, chalk line, lots of water, eye safety, thin set, buckets, hammer, notched trowel, and nails.

You’ll want to take away all the molding and baseboards. Dispose of any present floor coverings, carpet, or wooden floors. Clean the subfloor making sure it's far free of dust and debris.

Ensure the floor is sturdy and solid. Deploy cement backer board onto the stabilized floor and at every ground joist screw, the backer board in with 2 inches galvanized screws. The old flooring will need to be disposed of, and maximum garbage offerings do not pick up such objects. The old flooring will want to be taken to the garbage dump. Maximum dumps rate a price for the usage of their services, so ensure to make the trip worthwhile.

If a certified fliesen düsseldorf has been hired, they would have removed all the trim, flooring, and finished the clean-up. They might also have disposed of the old floors and some other debris, saving the resident the dump rate.

Set up your tiles into the inset with a firm downward stress. Remember to place spacers between the tiles. You may tap the tile on the corners gently to ensure that it is in the region. Start at the center and workout to the walls. Holzoptik fliesen tiles and border tiles are fixedlatter. Use a tile cutter or tile saw to reduce the tiles to a suitable length. Depart the tile to set up in the thin set overnight.

Later the xxl fliesen has set for a whole day; it's time to grout the tile. The use of the trowel you'll slide throughout the blob of grout that you have at the floor going right, left, up and down within an arm's reach.

Many professional installers are capable of getting you tile at a good discount, especially when they're installing the tile floor. Quite often they do the installation, easy up, and elimination of all of the old floors and debris for a discounted cost. If the floor is installed by an expert installer, they'll warrant the tile and work that they have got finished. It normally takes the contractor 2 to 3 days to do a tile ground installation. That is commonly a one or two years guarantee.

Source Link: https://bit.ly/2P0EpVG

Like it? Share it!


Fliesentechnik Drescher

About the Author

Fliesentechnik Drescher
Joined: May 18th, 2018
Articles Posted: 14

More by this author