ultrafine mill operation note you must know

Posted by birder2525 on January 8th, 2019

There may be many problems during the ultrafine mill operation. Therefore, in order to reduce these problems, a trial run operation is required, and possible problems are solved during the test run to ensure that the subsequent production process can be smoothly performed.

In order to reduce the breakdown of ultrafine mill in the production process, the newly purchased equipment will be commissioned after the installation is completed. This can check the equipment itself and the possible faults in the installation process. This is the purpose of commissioning. Tell us about the correct operation of the test run.

The first is the no-load operation. When the material is not added, run the ultrafine mill machine, and then observe whether the screws and other parts are loose and whether the wire connection is normal, and the wires need to be protected from being stepped and pressed. Will cause the line problem, but also need to pay attention to whether there is noise or other anomalies, if not, no-load operation takes 2 to 4 hours, so you can fully observe the possible failure, during operation should pay attention to whether the bearing of the ultrafine mill machine Will be high temperature, etc., these are no problem after the on-load operation.

Like it? Share it!


birder2525

About the Author

birder2525
Joined: May 10th, 2018
Articles Posted: 204

More by this author