Hyper scale Data Centers in Finland Market Scope,Key-Players,Strategy till 2025

Posted by Deeksha on August 1st, 2019

Market Research Hub (MRH) has actively included a new research study titled “Hyper scale Data Centers in Finland: Market Shares, Strategies, and Forecasts, 2019 to 2025” to its wide online repository. The concerned market is discoursed based on a variety of market influential factors such as drivers, opportunities and restraints. This study tends to inform the readers about the current as well as future market scenarios extending up to the period until 2025. In addition, a deep analysis of the competitive landscape, including prime market players is also enclosed in this report.

Check for the sample here @ https://www.marketresearchhub.com/enquiry.php?type=S&repid=2458289

 The 2019 study has 159 pages and 69 tables and figures. Growth is based on implementation energy efficient data centers. Access to locations across the world through strategically placed cables promise to make Finland the location of choice for a data center.

Google PUE of 1.1 in Finland is unmatched anywhere else in the world. Climatic environment is an asset in Finland as data centers need cooling. Scale is everything in the era of Clos architecture of the data center and optical transceivers for inside the data center. Data moves at the speed of light around the network inside the data center so scale is important. Outside the mega data center, the charter is to leverage international cable infrastructure. Plans are attracting investment in data communications access in Finland that provides worldwide reach with millisecond data transmission anywhere.

The study, “The communication of data accurately is a demanding task. The data centers in Finland are poised to be world-class, supporting inter connectivity to the US, Europe, and Asia.”

The market for hyper scale Data Centers in Finland sector at billion in 2018 is expected to be worth billion by 2025. Growth is based on implementation of streaming mobile smart phone network connectivity, tablet use for mobile computing, Internet apps, cloud computing, IoT, and business process management systems (BPM) that support collaboration. 5G processes API components to support technology innovation and change. Hyper scale data center implementation is a key aspect of those aspects of web process making IT flexible and adaptable. Finland has the land and the renewable energy capability to make data centers efficient. The cold climate is a asset when cooling heat generated by the compute infrastructure.

Companies Profiled

Market Leaders

  • Google
  • Equinix
  • Fujitsu
  • Microsoft
  • Telia
  • Tieto

Market Participants

  • Cinia
  • Data Center Finland Oy
  • Digitice
  • Ficolo
  • Microsoft / Nokia
  • Amazon Web Services
  • Neoxen Systems
  • North Shore DC's
  • The Arctic Connect Cable way
  • North Shore DC Engineering Services for International Operators
  • Silent Partner Group of Companies
  • Telia
  • Sonera

Key Topics

  • Hyperscale Data Centers
  • Mega Data Centers
  • Efficient Data Centers
  • Google PUE of 1.1 in Finland
  • Finland Data Communication
  • World class data centers
  • Business Ecosystems Networks
  • Colocation Service Equipment
  • Round Trip Delay Table
  • Cloud Exchange Fabric Data Transport
  • Arctic Connect Cableway

Request TOC of the Report @ https://www.marketresearchhub.com/report/hyperscale-data-centers-in-finlandmarket-shares-strategies-and-forecasts-2019-to-2025-report.html

Table of Contents

Finland Revenue Generating Datacenters: Market Shares, Market Strategy, and Market Forecasts, 2019 to 2025 1
Efficient Data Centers: Low PUE, That Further Generate Revenue 1
Finish Data Center Executive Summary 16
Finland Data Center Market Shares 18
Finland Data Center Market Forecast 19
Finish Data Center Market Description and Driving Forces 22
1.1 Finland: Business Environment for Data Centers 22
1.2 Economy Runs on Efficient Digital Data Networks and Intelligent Software Solutions 23
1.2.1 Cinia Group Leads the Sea Lion Initiative 27
1.2.2 Sea Lion Submarine Data Network Cable 28
1.2.3 Factors Supporting Data Centers in Finland: Low Cost of Energy 28
1.3 Finland: Data Centre Powerhouse 29
1.4 Data Centers to Generate Revenue 30

Finish Hyper Data Center Market Shares and Forecasts 32
2.1 Finland Data Center Market 32
2.2 Finland Data Center Market Shares 34
2.3 Finland Data Center Market Forecast 37
2.3.1 Data Center Growth 41
2.3.2 Data Center Revenue Market Forecast Worldwide 44

Hyperscale Data Centers in Finland: Descriptions 45
3.1 Data Centres in Finland 45
3.1.1 Data Centers in Finland 45
3.1.2 Data Center Risk Index: Finland 46
3.1.3 Businesses in Finland support good digital infrastructure 47
3.1.4 Finland Data Center Investment Opportunities: 63
3.1.5 Large-Scale Data Centres in Finland 66
3.2 Google 66
3.2.1 Google Seawater Cooling System 67
3.2.2 Google Finland Wind Power Purchase Agreements 68
3.3 Yandex 68
3.3.1 Yandex Heating a Finnish City with Data Centre ... 69
3.4 Finland Data Center - hotelmodularconstruction.com 69
3.5 Equinix 69
3.5.1 Equinix Finland Gateway Between the East and West 70
3.6 Ficolo €50m Helsinki Data Center - DCD 71
3.7 Tieto Construction of Finland Data Center - DCD 72
3.8 Telia Finland Oyj 72
3.8.1 Telia Finland, Telia Helsinki Datacenter 72
3.8.2 Telia Construction 74
3.8.3 Telia Renewable Energy Use and Consumer Home Heating 76
3.9 Data Center Operator Hetzner Online 77
3.9.1 Hetzner Online Finland Data Center Cheap Electricity and Free Cooling 78
3.9.2 Finland Offers Data Center Operations Competitive Advantage to Hetzner Online 78
3.9.3 Hetzner Finland Data Center Ready for Expansion 80
3.9.4 Hetzner Finland Trusted Data Center Location 80
3.9.5 Hetzner in Finland 81
3.10 Finland Aiber Networks Data Center 82
3.11 Data Centers Are Big, Designs are Complex 83
3.11.1 Componentization 83
3.11.2 Line of Business Loses Control of Hardware Servers 85
3.11.3 Mega Data Center Cloud Construction Complexities: Multi-Threading87
3.11.4 Mega Data Center Cloud Manufacturing Challenges: Scale 88
3.11.5 Data Center Infrastructure Construction Scale 91
3.11.6 Microsoft 92
3.11.7 Level of Mega Data Center Design Expected by Client / Supply Chain; Design Intent, IFC 92

 Continued………. #@

 

Like it? Share it!


Deeksha

About the Author

Deeksha
Joined: January 3rd, 2019
Articles Posted: 12,334

More by this author