Ramlala will be temporarily sitting in the temple

Posted by Konark tv on March 18th, 2020

Konark Bureau: Lord Shriram will temporarily sit in the Bulletproof Temple before the construction of the Ram Temple in Ayodhya. The construction of Ramlala in the new temple is in full swing. A seven-member team has been working on the new temple since Sunday evening. A platform has been built to build the temple. It has been reported that the fiber wall will fit inside after the woodworking. Efforts are underway to complete the work by March 17. But it could take another two days for the final and other work to be completed by March 20.
Chief Minister Yogi Adityanath will bring Ramlala from the Tent temple at 4 am on March 25 and install her in a new temporary temple. From the first day of Navratri, ordinary devotees will begin to see the Ramlala at the new temple.

The new temporary temple will be 24 feet long and 17 feet wide
Fitting for the Fiber Temple begins Sunday. It is 24 feet high and 17 feet wide. Its height is three and a half feet above the ground. On top of that, a strong corner roof will be built 25 feet high. Strong angles are also being built around it. All of this work is now in its final stages The temple will also have two ACs to protect from the heat.

Like it? Share it!


Konark tv

About the Author

Konark tv
Joined: March 16th, 2020
Articles Posted: 21

More by this author